EV Charging Stations, Your Business, and the Impacts to Utility Services

Electric Vehicles (EVs) have recently grown in popularity. What was once a nuanced to own is now becoming mainstream. The Tesla Model Y was one of the top 5, best-selling models (both cars and SUV’s) in the U.S. for the first half of 2023. While the Tesla Model 3 was the second, best-selling car, behind only the Toyota Camry.

EVs make up less than 5% of the vehicles in operation within the U.S., but their quick rise in popularity presents opportunities and challenges as businesses seek ways to adjust.  EVs disrupt the traditional mobility model with one of the major shifts being the recharging processes.

The Advantages

Combustion-powered vehicles require refueling at dedicated stations, but EVs can theoretically recharge anywhere that has electricity without the complexity of owning a gas station.  While recharging, the driver and occupants are restricted to the local area which creates opportunities for your business.

  • Increased foot traffic.
  • Competitive advantage by providing convenience.
  • Supply EV charging for employees.

When evaluating whether an EV charging station is a good solution for you, it is important to weigh the cost and benefits, holistically. As with all asset purchases, it is best to look at the total cost of ownership. For EV charging systems, this includes upfront costs, electric usage, inspections, and maintenance.

The Factors to Consider

When adding up the total investment of ownership for an EV charging system, the price to install the equipment varies by location, but can be obtained through an installation partner. The routine maintenance costs and inspections are more predictable, and can be performed by the same installation partner. This leaves electricity as one of the more challenging components to calculate.

Electricity can impact EV charging systems in two ways: the infrastructure upgrades and the ongoing cost of power. Price variables are driven by how fast it takes to charge the vehicles. Fast charging (Level 3) is primarily for customer usage. When designing for employee use, slower chargers (Level 2) can be used since the employee will be at the location for a longer period, and the solution can be layered with intelligent software to help minimize impacts at the site.

Infrastructure Upgrades

When considering the installation of a fast-charging system, one thing to consider is how much excess electrical capacity is there for the location. There are three common ways to determine the total capacity available:

  • Your utility representative can let you know.
  • Electrical drawings for the building, such as: construction drawings, single line diagram, or an arc flash report.
  • The transformer nameplate at the service entrance will list capacity.

Once capacity is known, you need to determine how much you are currently using. For an estimate, you can look at one of your higher electric bills. One of the meter readings or billing lines should show the highest kW demand for that month. This value is a decent proxy for reference, but will be lower than the actual instantaneous draw.

The difference between the total capacity available and the current demand is the excess capacity. If the charger size you are considering is less than the excess capacity, then the infrastructure upgrade costs should be minimal. If it is greater than the excess capacity, then you will need to reach out to the utility company or install additional equipment like a battery or perhaps capacitor banks. If required, the utility company can let you know what costs are on their end to upgrade your service or change your rate class.

The Cost of Power

The second electric impact at the site is the ongoing cost of power. EV chargers can dramatically change the way the site uses electricity. It will now draw very high loads for a short duration and repeat this throughout the day.

For many commercial locations, around 30% – 60% of the bill is based on fixed charges, and the most common way to recoup this is through demand charges ($/kW). With the charger making those high draws, it can dramatically increase the fixed cost allocation on the bill. Also, it may require the site to go to a different rate class. Like the infrastructure, in areas where there is a pronounced impact on the utility bill, adding a battery to the project may help mitigate electric cost increases.

As an example, adding a 150kW charger increased the bill by 40%.  Alternatively, adding a 60kW charger in a similar circumstance increased the bill 20%.  Its important, to have a full understanding of the tradeoffs prior to installing charging equipment, so the best decision can be made.

In Closing

Electric vehicles are growing in popularity for both our personal and professional lives. When it comes to choosing EVs for your business, it is important to be prepared and understand the factors that go into them. Cost, infrastructure, business growth, and meeting sustainability goals are all things to consider when looking into electric vehicles.

To learn more about EVs, and what you can do to supplement them, please contact your AEP Energy Sales Representative. Not currently working with an AEP Energy Sales Representative? Click here to request more information.

AEP Energy does not guarantee the accuracy, timeliness, suitability, completeness, freedom from error, or value of any information herein. The information presented is provided “as is”, “as available”, and for informational purposes only, speaks only to events or circumstances on or before the date it is presented, and should not be construed as advice, a recommendation, or a guarantee of future results. AEP Energy disclaims any and all liabilities and warranties related hereto, including any obligation to update or correct the information herein. Summaries and website links included herein (collectively, “Links”) are not under AEP Energy’s control and are provided for reference only and not for commercial purposes. AEP Energy does not endorse or approve of the Links or related information and does not provide any warranty of any kind or nature related thereto.

Up Next

The Future of Energy Supply: What to Expect in 2025

Commercial

We’re taking a closer look at what 2025 holds for businesses that rely on energy suppliers like AEP Energy. The energy landscape is evolving rapidly, and understanding these changes can help you make informed decisions about your energy needs. Let’s dive in. Renewable Energy on the Rise First off, renewable energy is continuing its upward …

PJM Capacity Auction Secures Resources Amid Tightening Supply and Demand

Commercial

3 min read At the end of July, PJM Interconnection successfully conducted its capacity auction for the 2025/2026 Delivery Year, ensuring sufficient resources to meet the Regional Transmission Organization (RTO) reliability requirements. This year’s auction saw significantly higher prices across the region, driven by a tighter supply/demand balance due to generator retirements, increased electricity demand, …